List of Practical Activities- Modeule 3

ELECTRICAL & ELECTRONICS TECHNOLOGY

List of Practical Activities - Module 3


1. Identify the parts of lead acid battery
2. Dismantling & assembling of lead acid battery.
3. Charging of lead acid battery.
4. Testing the condition of a Fully charged & discharged battery.
5. Precautions to be taken during maintenance of lead acid battery.
6. V I characteristics of a Zener diode.
7. Regulated power supply using IC 78XX and Zener diode
8. Common Emitter amplifier circuit.
9. Verification of truth table of logic gates.
10. Testing of Solar panel and measurement of voltages under different irradiations.
11. Open/short circuit testing of PV module by measuring voltage &current.
12. Maintenance of PV module.
13. Assembling and installing module/panel as per design.
14. Selecting & Installing battery as per the design.
15. Installation & Testing of inverter circuit.
16. Installing wiring system for solar equipment.
17. Assembling & Installing solar devices.

18. Series & Parallel connection of PV module to obtain desired voltage &power.

No comments